Letter 11 / 7 / 83
Today we walked right around the island. My legs are aching - I'd love a deep hot bath ... but the water is off, pump is broken again, and I haven't even had a shower for four days (just swims).
The back of the island is very beautiful, rugged, and we had quite a few breath-holding moments leaping across rocky holes where the water way down below gurgles and spouts, me carrying Alison in the sling and Peter was carrying James. We didn't start off intending to go right around, so we didn't have much food or water. Fortunately the tide was way out or we would have been caught when we were almost all the way around, but that did make it slippery in places. It was about 4 1/2 hours hard slog.
Solar kit
A week ago the ship came. We got our solar lighting kit (now outside soaking up rays, but we've had solid cloud all week and the battery hasn't built up enough charge to start using it), rocking chair, bed, ceiling (though the important bits have gone missing), wardrobe (or rather linen closet), paint - the floor-paint went missing. We received it all by mail, we sent it to ourselves. We guessed we had sent about 50 boxes but didn't expect them all to arrive at once. But they had been saving them up on TI for us. There were 44 very large canvas Australia Post mail sacks, with one or two (10-20kg) boxes in each. There was absolutely no room to move in our tiny house. It took hours to bring them all indoors, and most of the day to get them out of the bags, let alone open the actual boxes. Peter had to make three trips carrying the empty mail bags back to the store. And - our boxes aren't all here yet.
What a week its been. Each night we flop onto our new bed, aching all over from the physical exertion. But we have 3 shelf units and the cupboard (all arrived flat-pack) erected and fully loaded, and almost all of the boxes have disappeared. And two rooms are nearly painted - it takes so long with un-lined walls, raw wooden frames (very uneven and rough as well as absorbent) to coat as well as the back side of the fibro to paint which is very absorbent.